首页 > 装修问答 > 装修 > 装修英语,求翻译<急>?

装修英语,求翻译<急>?

浏览次数:1256|时间:2024-06-17

热门回答

2024-06-16格子女77
s technical staff with experience in the actual circumstances and after their visit to believe that such anti-huang bracket installation solve the shock has no real meaning. Please your company to address and solve this problem, and requested the management of the construction program as soon as possible to pay on our side, please provide specific installation program of your company. If you must install the anti-huang bracket;s progress and construction programs have had a great impact, but the whole duct still a lot of problems in the construction process in our company has repeatedly found that many Regional mechanical and electrical side also unable to adjust.
4 .
3.4), site management and technical staff found that many duct close to the ceiling angle, have made significant adjustments to my company', please design staff and management to confirm, though by your company coordinate and solve some problems, while the first floor of the east elevator office is required to produce steel structure、 produced a first floor ceiling to install the construction process, resulting in insufficient space to install the keel、 production of the first floor of the east of the main entrance of the building.6.
2 , as well as the southwest corner of the door cover problems, ceiling 3、because of design problems (wind pipe 3, so that the air supply duct of the vibration generated in the process will cause the ceiling shaking, your company requested our bracket for the ceiling to install anti-huang, and the preparation of information and the delivery of our drawings in order to facilitate the latter part of our construction schedule and program adjustments. Please charge will change on the first floor at this stage is summarized, I company managers to staff the report、production of the first floor of the building as part of the region due to placement of equipment and space management and other reasons, my companyƇ

135